A data transmission project design review platform through integrated solutions, including support for content planning and review information; support content access scheme evaluation information; grid project feasibility study and 220 thousand kV and above project preliminary design review; model construction planning evaluation platform informatization construction model evaluation platform model of information construction, access system, and the formation and integrated scheme of power transmission engineering design data through the evaluation platform. The invention can formulate a scheme for completing the power grid planning review and the power grid access informatization evaluation. It is helpful to improve and perfect the design assistant system of power transmission and transformation project, to realize the planning review, access system review, the establishment of information construction model and the integration platform of power transmission project design review platform.
【技術(shù)實現(xiàn)步驟摘要】
輸變電工程設(shè)計評審平臺數(shù)據(jù)貫通集成方案
本專利技術(shù)涉及一種輸變電工程設(shè)計評審平臺數(shù)據(jù)貫通集成方案,屬于電力
技術(shù)介紹
隨著電力行業(yè)的不斷發(fā)展,對于電網(wǎng)工程設(shè)計評審需要更專業(yè)的技術(shù)手段和信息化系統(tǒng)模型。現(xiàn)已建成的輸變電工程設(shè)計輔助評審系統(tǒng),解決了項目初設(shè)評審過程中存在業(yè)務(wù)數(shù)據(jù)分散、格式多樣化,業(yè)務(wù)缺少輔助支撐等各類困難。為提升電網(wǎng)項目規(guī)劃建設(shè)全過程評審咨詢業(yè)務(wù)支撐能力,實現(xiàn)規(guī)劃、可研、初設(shè)、施工圖設(shè)計全過程評審業(yè)務(wù)銜接和數(shù)據(jù)貫通,滿足電網(wǎng)項目決策、設(shè)計評審等工作向精益化、標(biāo)準(zhǔn)化方向發(fā)展,所以電網(wǎng)規(guī)劃、電網(wǎng)接入信息化評審方案已成為一個重視的研究課題。
技術(shù)實現(xiàn)思路
為了更好服務(wù)于公司電網(wǎng)建設(shè)發(fā)展,強(qiáng)化設(shè)計管理,以滿足實際工作需求,提出輸變電工程設(shè)計評審平臺數(shù)據(jù)貫通集成方案。本專利技術(shù)要解決的具體問題是:1.將現(xiàn)有平臺評審階段向項目前期延伸,研究項目從源頭至初步設(shè)計的數(shù)據(jù)貫通,為后期項目規(guī)范評審機(jī)制提供保障手段。現(xiàn)階段評審平臺已完成初步設(shè)計評審建設(shè)內(nèi)容,已規(guī)范了初步設(shè)計評審流程,標(biāo)準(zhǔn)了初步設(shè)計審核資料。為了能更好的貫通項目源頭至初步設(shè)計階段,故需要對規(guī)劃評審、接入評審先行開展研究工作,為規(guī)范項目評審機(jī)制提供有力保障。2.將現(xiàn)有平臺評審階段向項目前期延伸,縱向銜接規(guī)劃、接入、可研、初設(shè)評審業(yè)務(wù),是為了實現(xiàn)電網(wǎng)“大數(shù)據(jù)”分析,奠定有力的技術(shù)支撐。現(xiàn)階段評審平臺已完成初步設(shè)計評審建設(shè)內(nèi)容,平臺內(nèi)已有大量初步設(shè)計圖紙、概算文件以及相關(guān)參數(shù),縱向貫通規(guī)劃、接入、可研評審數(shù)據(jù)后,可對各階段的數(shù)據(jù)進(jìn)行分類存儲,并對關(guān)鍵數(shù)據(jù)進(jìn)行抽取、加工、清洗,為后期電網(wǎng)“大數(shù)據(jù)”奠定基 ...
【技術(shù)保護(hù)點】
輸變電工程設(shè)計評審平臺數(shù)據(jù)貫通集成方案,其特征在于:A.規(guī)劃評審信息化支撐內(nèi)容通過統(tǒng)一收集、歸檔管理電網(wǎng)規(guī)劃成果數(shù)據(jù),規(guī)范化規(guī)劃成果資料申報格式和內(nèi)容,包括規(guī)劃報告、規(guī)劃項目庫、專題報告、地理接線圖;研究從資料送審至評審意見出具的全過程規(guī)劃成果評審業(yè)務(wù)管理,提升規(guī)劃評審質(zhì)量和工作效率;B.接入方案評審信息化支撐內(nèi)容通過分解電網(wǎng)接入方案、電源接入方案的專業(yè)要求和評審需要,分別建立常規(guī)電網(wǎng)接入、電源接入模型和匹配方法,完成以評審流程管控、評審數(shù)據(jù)規(guī)范為信息化基礎(chǔ)的方案;C.電網(wǎng)項目可研及220千伏及以上項目初設(shè)評審在現(xiàn)有評審平臺的基礎(chǔ)上,開發(fā)電網(wǎng)項目可研及220千伏及以上項目初設(shè)評審功能,提升平臺現(xiàn)有功能,具體包含典型工程的擇優(yōu)入庫、設(shè)計指標(biāo)獲取源的準(zhǔn)確性、通用設(shè)計標(biāo)桿指標(biāo)區(qū)間確定的科學(xué)性;D.模型建設(shè)完成規(guī)劃輔助評審平臺信息化建設(shè)模型、接入系統(tǒng)評審平臺信息化建設(shè)模型,并形成與輸變電工程設(shè)計評審平臺數(shù)據(jù)貫通的集成方案。
【技術(shù)特征摘要】
1.輸變電工程設(shè)計評審平臺數(shù)據(jù)貫通集成方案,其特征在于:A.規(guī)劃評審信息化支撐內(nèi)容通過統(tǒng)一收集、歸檔管理電網(wǎng)規(guī)劃成果數(shù)據(jù),規(guī)范化規(guī)劃成果資料申報格式和內(nèi)容,包括規(guī)劃報告、規(guī)劃項目庫、專題報告、地理接線圖;研究從資料送審至評審意見出具的全過程規(guī)劃成果評審業(yè)務(wù)管理,提升規(guī)劃評審質(zhì)量和工作效率;B.接入方案評審信息化支撐內(nèi)容通過分解電網(wǎng)接入方案、電源接入方案的專業(yè)要求和評審需要,分別建立常規(guī)電網(wǎng)接入、電源接入模型和匹...
【專利技術(shù)屬性】
技術(shù)研發(fā)人員:王波,周翔,薛韜,王靜怡,喬黎偉,王海潛,王哲,徐寧,袁曉蕓,郭煒,邵夢虞,史小燕,陳丹,南開輝,朱正希,李國文,劉迪,吳蓓,
申請(專利權(quán))人:國家電網(wǎng)公司,國網(wǎng)江蘇省電力公司,國網(wǎng)江蘇省電力公司經(jīng)濟(jì)技術(shù)研究院,南京電力工程設(shè)計有限公司,
類型:發(fā)明
國別省市:北京,11
還沒有人留言評論。發(fā)表了對其他瀏覽者有用的留言會獲得科技券。