The utility model discloses a pile for treatment of low embankment, railway soft soil foundation including composite foundation in embankment core stress area, the embankment core stress zone for ballastless track on both sides of the support layer 45 degrees below the regional diffusion angle range of the composite foundation are arranged on the top surface of the gravel cushion the middle of the gravel cushion, with geogrid, embankment is located in the core force in a bored pile, the bored pile top is provided with a reinforced concrete continuous beam plate. The utility model in the core stress zone in the embankment with bored piles and reinforced concrete continuous beam and thin plate in the bored pile top, solved due to some deep soft soil section affected by external factors to set the bridge, resulting in foundation treatment of conventional methods can not satisfy the settlement of ballastless track the control requirements and to ensure the stability of Subgrade under train load long-term problems. It is suitable for the treatment of deep soft soil foundation of high speed railway.
【技術(shù)實(shí)現(xiàn)步驟摘要】
【技術(shù)保護(hù)點(diǎn)】
1.一種用于處理鐵路低矮路堤深厚軟土地基的樁基,包括:位于路堤核心受力區(qū)外的復(fù)合地基,所述路堤核心受力區(qū)為無砟軌道支撐層兩側(cè)45°擴(kuò)散角范圍內(nèi)下面區(qū)域,所述復(fù)合地基頂面設(shè)有碎石墊層,該碎石墊層中間還設(shè)有土工格柵,其特征在于,位于路堤核心受力區(qū)內(nèi)設(shè)有鉆孔灌注樁,該鉆孔灌注樁樁頂上設(shè)有鋼筋混凝土連續(xù)薄板梁。
【技術(shù)特征摘要】
【專利技術(shù)屬性】
技術(shù)研發(fā)人員:顧湘生,蔣興錕,趙新益,孫紅林,熊林敦,陳尚勇,郭堅(jiān)鴿,彭志鵬,黃三強(qiáng),劉好正,李丹,沈偉升,余雷,吳成杰,朱先鋒,
申請(專利權(quán))人:中鐵第四勘察設(shè)計(jì)院集團(tuán)有限公司,
類型:實(shí)用新型
國別省市:83
還沒有人留言評論。發(fā)表了對其他瀏覽者有用的留言會獲得科技券。